Top-down pipe propulsion construction shaft starting device in a shielded tunnel and its construction method
基本信息
申請(qǐng)?zhí)?/td> | JP2021116685 | 申請(qǐng)日 | - |
公開(kāi)(公告)號(hào) | JP2022094289A | 公開(kāi)(公告)日 | 2022-06-24 |
申請(qǐng)公布號(hào) | JP2022094289A | 申請(qǐng)公布日 | 2022-06-24 |
分類號(hào) | E21D9/06;E21D1/06;E21D11/10;E21D11/15 | 分類 | 土層或巖石的鉆進(jìn);采礦; |
發(fā)明人 | 游 大江;帥 玉兵;王 浩;王 錫軍;王 利民;呉 昊;李 家?guī)?馬 云新;趙 洪巖;李 松林 | 申請(qǐng)(專利權(quán))人 | 北京建工土木工程有限公司 |
代理機(jī)構(gòu) | - | 代理人 | - |
地址 | - | ||
法律狀態(tài) | - |
摘要
摘要 | The invention discloses a construction method of a vertical shaft starting device for top-down pipe-jacking construction in a shield tunnel. According to the method, a pipe jacking machine and a matched trolley are transported to a vertical shaft construction position, an initial position is adjusted, a pipe piece supporting system is adjusted to a working position, a tunnel guide rail at the bottom of equipment is dismounted, a recyclable pipe jacking main machine is made to descend to the contact position capable of directly cutting a composite pipe piece through a crane, a starting steel sleeve is welded, the space between shield tail brushes is filled with grease, and a pipe jacking piece is hoisted to the construction position every time the pipe jacking machine tunnels to a certain position. By means of a matched trolley system and a crane pipe jacking supporting and jacking system, equipment can be integrally conveyed into a main tunnel or conveyed from the main tunnel, mountingand dismounting are convenient, and the construction time can be greatly saved; pipe jacking equipment can be flexibly conveyed to the designated position of the tunnel, and the pipe jacking pipe piece is pushed to the designated depth from top to bottom; and the shield tunnel pipe piece structure around the vertical shaft construction position can be effectively protected in the pipe jacking tunneling process. |